China Aluminum Southwest Aluminum Forging Factory Launches Zero Emissions Project for Industrial Wastewater

- May 09, 2018 -

China Aluminum Southwest Aluminum Forging Factory Launches Zero Emissions Project for Industrial Wastewater


     According to the person in charge of the power plant control station of the plant, the industrial waste water treatment capacity of the forging plant is 300 cubic meters per day. The treatment process uses oil-removing and flocculating gas plus floating-back pools, which are stored in two reused pools after treatment. Reuse rate reached 80%. There are two original recycling pools, one 100 cubic meters and one 300 cubic meter. The original filter is 40 to 70 cubic meters per hour. The activated carbon adsorption tower is not used. The pickling and caustic washing wastewater is treated by a neutralization wastewater treatment station and discharged into a temporary storage tank; the quenching furnace waste water is cubic meters per day, and the effluent only contains weak alkalinity, and is discharged directly without collection. No. 4 quenching furnace water maximum.


  • Package Aluminum Foil For Vacuum-packed Bag
  • 1050 Aluminum Plate
  • 1060 Aluminum Bar
  • 5052 Aluminum Tube
  • Aluminum Formwork Profile
  • Aluminum Tilt and Turn Window

Related Products