Hot Sale Aluminum Seal Bar

- Jan 31, 2018 -

Basic Info

  • Model NO.: asb1003

  • Bumper Position: Edge

  • Alloy Number: Typical AA3003 or Custom

  • Length: up to 5000 mm

  • Surface Finish: Original or Custom

  • Packing Way: Plywood Case

  • MOQ: 500 Kgs

  • Transport Package: Plywood Case

  • HS Code: 8708919000

  • Type: Heat Exchanger Seal

  • Material: Aluminium

  • Temper: Typical H112 or Others

  • Width/Height: up to 40 mm

  • Shape: Square,Rectangle,or Others

  • Application: Heat Exchanger

  • Lead Time: Within 10 Days



1. Alloy Number
No.Alloy NumberTemper
1.1Typical AA3003 or customH112
2. Product size and tolerance
No.SpecificationSizeTolerance
2.1Length (mm)Max 5000 or customized-
2.2Width5/6/10/13,etc or customized±0.2
2.3Thickness (mm)1.9/3/8/9.5,etc. or customized±0.05
3. Chemical composition for materials
No.NumberChemical Composition (%)
SiFeCuMnMgZnTiZrBiOthersAl
EachTotal
3.130030.60.70.05-0.21-1.50.050.1   0.050.15RE
4. Mechanical properties
No.NumberTemperYield Strength
Rp0.2(Mpa).
Min
Tensile Strength
Rm (Mpa)
Elongation
(%)
A50,Min
Remark
4.1AA3003H1125512846-
5. Surface finish
No.ItemDescription
5.1Surface finishThe surface  shall be smooth,clean and free from any contamination that cannot be readily removed by cleaning agents normally used in manufacturing
6. Packing,Shipping and others
No.ItemDescription
6.1PackingTo be packed in wooden crate
6.2MarkingEach box to be legibly marked with the name of the manufacturer or supplier, the designation of material,condition,dimensions and weight
6.3Shipping toolsShip goods by van to departune port then by sea to desitination port
7.Quality management and spot management
No.ItemDescription
7.1Quality control1. Quality assurance
a. Incoming material quality assurance; b. Process quality assurance; c. First sample quality assurance; d. Final quality assurance.
2. Process management-The right results are from the right process
a. Production process card control; b. Standard operational procedure;c.Job certification;d. Quality chart monitor.
3. Equipment and facility management
a. Periodic maintenance; b.Preventative maintenance.
4. Mold management
a. Mold life management; b.Periodic and preventative maintenance; c. Periodic inspection.
7.2Inspection ToolsAltimeter,Vernier caliper,Micrometer,3D coordinate measuring instrument
7.3Spot management"5S" management (sort,set in order,shine,standard,sustainable).



  • 7075 Aluminum Sheet
  • 7A04 Aluminum Sheet
  • 2A12 Aluminum Bar
  • 6A02 Aluminum Rod
  • 5000 Aluminum Strip
  • Aluminum Spring Door

Related Products